Skip to content
Tram launch to Stadion
All projects

Case study · Luxtram

Tram launch to Stadion

TACTI.K turned the opening of a tram station into a day of activities lived by families from the neighborhood.

ClientLuxtram
SectorPublic sector
Venue Lycée Vauban
Branches TACTIK
What we did
  • street marketing
  • brand activation

The challenge

The problem

Luxtram asked us to organize activations for the opening of new tram stops running to the Stade de Luxembourg.

  • Making a technical launch accessible to the public
  • Attracting a family and multigenerational audience
  • Activating the public space around the station
  • Creating a positive memory tied to the new tram

Our response

TACTIK was glad to work with Luxtram on the launch of their new tram stations. Our team ran the live event production, setting up engaging activities, workshops and games at the 'Lycée Vauban' station near Parc de Gasperich. We designed and delivered a dynamic, fun-filled day that drew in participants of all ages. From interactive workshops to entertaining games, we built a memorable experience that marked the expansion of the tram network.

  • Interactive workshops for all ages
  • Games and activities in the public space
  • On-site presence at Lycée Vauban station
  • An experience designed to run all day

The gallery captures the atmosphere of the day at Lycée Vauban station, from workshops and games to the crowds gathered near Parc de Gasperich.

Your next launch deserves a crowd on the ground

Talk about your project